▶ Watch the plant in motion: animated process diagramEvery result of the thesis turned into a key performance indicator with a definition, a formula and, where one exists, a benchmark. Pick a scenario to see how it scores.
Saving vs the RED II fossil comparator (94 g CO₂ eq/MJ), with the 65% threshold for new plants and 50% for older plants. Indicative only: cradle to gate on an HHV basis, upgrading and use not included, biogenic CO₂ counted as emitted.
✓ pass · ! watch · ✕ fail against the KPI's benchmark. KPIs without a benchmark are left out.
Wet manure is pumped as a slurry through hot, pressurised water and breaks down into biocrude, gas, solids and an aqueous phase. Cases 2 and 3 add a step that cleans the aqueous phase.
Four fifths of the slurry leaves as water-rich aqueous phase. Treating that stream (cases 2 and 3) returns about 99% of it as clean water with a COD below 250 mg/L.
Ribbon width is proportional to mass. 2,000 t/day of wet manure (78.76% moisture) mixed to a 20 wt% solids slurry. Hover a ribbon for its flow.
% of 17,700 kg/h dry feed. They add up to just over 100% because some water reacts into the products.
HTL off-gas composition, wt%.
HTL concentrates carbon and hydrogen and strips out nitrogen. The biocrude's heating value of 39.1 MJ/kg is in line with other manure biocrudes.
Higher heating value, MJ/kg. The raw manure is shown for scale.
Per kilogram of bio-oil, cradle to gate. Switch the impact category to see how transport and electricity take over once climate change is set aside.
The same plant on German grid electricity instead of wind. Each line starts at the wind result and ends at the grid result, as a multiple of the wind value.
Case 1. Cases 2 and 3 have the same AP, EP and toxicity results.
Air emissions per kilogram of bio-oil for the base case on wind electricity. Bars are on a logarithmic scale: each gridline is ten times the one before.
Prices: biocrude 400 €/t, biochar 200 €/t, wastewater 1.64 €/m³.
Recomputed from the Aspen Plus mass balance for each scenario, with the GaBi background process for every input.
| Flow | Direction | Amount | Unit | Background process |
|---|
Rebuilding the thesis as code makes every figure traceable. These checks compare the tables, the text and the mass balance. Items marked "review" are worth correcting in a future paper.